From 1965 to today

DOMI S.A. is a leading Greek engineering firm in the field of infrastructure and is activated in the design, supervision, consultancy, planning and implementation of bridges, tunnels, buildings, technical, industrial and special civil engineering projects (e.g. silos, water towers, sewage plants, piling etc) having a significant experience in earthquake engineering, including design and detailing of structures against seismic actions, seismic isolation, inspections, assessment and retrofitting.

Flyover of Peripheral Thessaloniki

The largest flyover in Greece with a total length 13km (2021)

Tsakona Bridge

Largest steel arch bridge in Greece - Arched structure of 300m (2015)

Memaliaj Bridge

Cantilever method of steel section of main span of 76.0m (2013)

Costa Navarino Resort

Participation at the final design of the largest hotel in Greece (2009)

Metsovo Bridge

Largest span in Greece in the cantilever method (235m) (2008)

Rion-Antirion Bridge

Participation in the main bridge design, complete design of approach viaducts and technical support at the largest bridge in Greece with the largest span worldwide at its completion (2004)

Kifisos Fly-over

Total length : 1500m (2004)

Votonosi Bridge

Largest span in Greece in the cantilever method (230m) at its completion (2004)

Bridge over Lissos River

1st implementation of incremental launching in Greece (1998)

Moving of Aghioi Saranta Church

1st moving of structure in Greece (1991)

More

International presence

In the last ten years DOMI S.A. has successfully broaden the range of activities in the international market, undertaking major projects in a growing number of countries.

map en v5