domi-ae.gr - Main Component
Pedestrian Bridge at Kifisias Avenue
Owner:
Ministry of Public Works
Location:
Athens
Construction:
AKTOR S.A.
Construction Period:
2004
Total Length:
36.40 m
Maximum Span:
36.40 m
Μέγιστο Ύψος Βάθρου:
8.55 m
Construction Method:
Prefabrication, installation with cranes
Deck:
Steel
Piers:
Steel
Foundation:
Spread Foundation
Services:
Complete design, technical support
Comments:
Coating through glass panes