domi-ae.gr - Main Component
Bridge Paliouria-Panaghia
Owner:
PPC S.A.
Location:
Grevena - Ilarionas Dam
Construction:
AEGEK SA
Construction Period:
2008-2009
Total Length:
370.85m
Maximum Span:
120.0m
Maximum Pylon Heigth:
41.0m
Construction Method:
Balanced cantilever method and prefabrication
Deck:
Pre-stressed, box section and pre-stressed prefabricated beams of 1.60m height
Piers:
Reinforced concrete
Foundation:
Piles
Services:
Final design, construction consultant
Comments:
Combination of cantilever and precast beam bridge